Runkle Canyon Residential Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Runkle Canyon Specific Plan

The Runkle Canyon Specific Plan guides residential development of the 1,595-acre site for construction of 461 attached and detached single-family dwellings and a public neighborhood park.  The Plan was adopted by the City Council in 2004. The project also included approval of the related Development Agreement, Tentative Tract Map, Planned Development Permit, and Affordable Senior Housing Agreement. The project is being developed by Runkle Canyon, LLC, which involves a joint venture between KB Home (master developer/builder) and Lennar Homes.

The Specific Plan project community includes three distinct neighborhood types containing 25 detached custom single-family homes on minimum 20,000-square foot estate-sized lots, 298 detached single-family homes on approximately 7,700-square foot average-sized lots (minimum 5,500 sq. ft.), and 138 senior condominiums, including 62 affordable senior units.

The central area of the site contains a public neighborhood park. Also, a public open trail system will traverse through the site to the southern project boundary. Approximately 1,150 acres are designated as open space. In addition, a potential golf course area is situated in the site’s northwest portion.

Runkle Canyon Vicinity MapRunkle Canyon Specific Plan Map

Runkle Canyon Specific Plan Land Use Plan

The site plan and architecture for the senior condominium neighborhood were approved by the Planning Commission in June 2013. The senior condominiums will be situated within one-story duplexes, two-story fourplexes, and two-story eightplexes. The second-story condominiums are accessed by elevators and stairs.

 

Runkle Senior Condominiums

Runkle Canyon Senior Condominium Neighborhood

Grading of the site development areas commenced in Fall 2013. The site plan and architecture for the detached single-family homes will be considered by the Planning Commission at a public hearing in the future. No time period on commencement of building construction has been determined.

If you have any questions or require further information, please contact the Planning Division at (805) 583-6769. 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer